Use este identificador para citar ou linkar para este item: https://repositorio.ufba.br/handle/ri/9291
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.advisorLima, George Marconi de Araújo-
dc.contributor.authorSantor-Jr., José-
dc.contributor.authorLima, George Marconi de Araújo-
dc.creatorSantor-Jr., José-
dc.creatorLima, George Marconi de Araújo-
dc.date.accessioned2013-03-28T12:51:45Z-
dc.date.available2013-03-28T12:51:45Z-
dc.date.issued2013-11-
dc.identifier.urihttp://www.repositorio.ufba.br/ri/handle/ri/9291-
dc.description.abstractWe provide four new schedulability tests for a scheduling model according to which there is a high priority task concurrently executed with a set of EDF-scheduled tasks. All tests are proved correct and have their performance evaluated by simulation.pt_BR
dc.description.sponsorshipUFBA (Edital PROPI 2011); CNPq (Edital Universal); CAPES (Bolsa de doutorado)pt_BR
dc.language.isoenpt_BR
dc.publisherSociedade Brasileira de Computaçãopt_BR
dc.subjectreal-time systemspt_BR
dc.subjectschedulability testspt_BR
dc.subjectEDFpt_BR
dc.titleSufficient Schedulability Tests for EDF-Scheduled Real-Time Systems under Interference of a High Priority Taskpt_BR
dc.typeArtigo de Eventopt_BR
dc.description.localpubNatal, Rio Grande do Nortept_BR
dc.identifier.numberProc. of the Brazilian Symposium on Computing Engineering (SBESC 2012)pt_BR
Aparece nas coleções:Livro e Capítulo (PGCOMP)

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
jaugusto-sbesc2012.pdf118,58 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.