Use este identificador para citar ou linkar para este item: https://repositorio.ufba.br/handle/ri/6362
Registro completo de metadados
Campo DCValorIdioma
dc.contributor.authorLima, Luiz Rogério Pinho de Andrade-
dc.contributor.authorHodouin, D.-
dc.creatorLima, Luiz Rogério Pinho de Andrade-
dc.creatorHodouin, D.-
dc.date.accessioned2012-07-06T14:46:58Z-
dc.date.available2012-07-06T14:46:58Z-
dc.date.issued2006-
dc.identifier.issn0892-6875-
dc.identifier.urihttp://www.repositorio.ufba.br/ri/handle/ri/6362-
dc.descriptionRESTRITOpt_BR
dc.description.abstractThe mineral industry has been using cyanidation to recover gold from ores for more than a century; however, a systematic study of the best reactant addition strategy in a cascade of agitated leaching tanks is not available in the open literature. A phenomenological mathematical model of the gold cyanidation process, calibrated with a set of industrial data from an Australian plant, together with an economic performance index is used to analyze this problem. The simulated results show that the best compromise between the two antagonistic effects, cyanide consumption and gold recovery, which are both function of cyanide concentrations, leads to a reagent distribution that depends on the leaching and cyanide consumption kinetics, pulp feed characteristics, and economic factors such as the gold market value. For the specific studied plant, in the operating range of low cyanide consumption and fast gold dissolution, all the cyanide must be added in the first tank; however, in the operating conditions of high cyanide consumption, cyanide has to be distributed in the first, second and third tanks.pt_BR
dc.language.isoenpt_BR
dc.publisherMinerals Engineeringpt_BR
dc.sourcehttp://dx.doi.org/10.1016/j.mineng.2005.12.001pt_BR
dc.subjectCyanidationpt_BR
dc.subjectGold orespt_BR
dc.subjectLeachingpt_BR
dc.subjectModellingpt_BR
dc.subjectProcess optimizationpt_BR
dc.subjectProcess synthesispt_BR
dc.titleSimulation study of the optimal distribution of cyanide in a gold leaching circuitpt_BR
dc.title.alternativeMinerals Engineeringpt_BR
dc.typeArtigo de Periódicoen
dc.typeArtigo de Periódicopt_BR
dc.identifier.numberv.19, n.13pt_BR
Aparece nas coleções:Artigo Publicado em Periódico (PEI)

Arquivos associados a este item:
Arquivo Descrição TamanhoFormato 
CC.pdf_4410,77 kBAdobe PDFVisualizar/Abrir


Os itens no repositório estão protegidos por copyright, com todos os direitos reservados, salvo quando é indicado o contrário.